UNI-T UT211 Spécifications Page 17

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 30
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 16
Note
The test leads can add 0.1 to 0.2 of error to resistance measurement. To obtain
precision readings in low-resistance measurement, it is necessary to subtract the
value measured when the testing leads are short circuited from the reading.
If reading with shorted test leads is not less than 0.5 , check for loose test leads,
incorrect function selection, or any other reasons.
The LCD displays OL indicating open-circuit or the tested resistor or the resistor
value is higher than the maximum range of the Meter.
For high-resistance measurement (>1M ), it is normal to take several seconds
to obtain a stable reading.. In order to obtain stable reading, try to use as short
as test lead possible.
When resistance measurement has been completed, disconnect the connection
between the testing leads and the circuit under test, and remove the testing leads
away from the input terminals of the Meter.
Model UT211: OPERATING MANUAL
17
Vue de la page 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 29 30

Commentaires sur ces manuels

Pas de commentaire